Project History
 
  • Client: Perodua Manufacturing Sdn Bhd

    1. Installation of Ventilation System at Receiving Bay Myvi/Alza, Logistic Department (Year 2011)
    2. Progress Lane Trolley fabrication for Supply & Storage Area (Year 2011)
    3. Fabricate & install A2 SPS Box (for door parts) to commonise (MyVi, Alza and D54T) (Year 2011)
    4. Install Water Rinse Tracking System for ED Line, Paint Shop (Year 2011)
    5. Design, fabricate, install & commissioning of A2 Chassis & Engine S/A Line Spot Cooler (Year 2010)
    6. Supply & install Air Powered Door Off Trolley for model Myvi & D46T for A2 Door Sub-Assy Line (Year 2009)
    7. Supply & install Instrument Panel (IP) Manipulator handling system for model Myvi D46T (Year 2009)
    8. Design, fabricate, install & commissioning of A2 Fuel Tank Lifter (Year 2009)
    9. Parts Fabrication-PU/MC Nylon/etc (Year 2011)

  • Client: Perusahaan Otomobil Nasional Sdn Bhd

    1. Design, fabricate & supply of P3-90A / GS41 part & component pallets (Year 2011)
    2. Replace Piping E.D Circulation and Gate Valve at painting shop main line (Year 2010)
    3. Rrepair exhaust fan unit (Year 2009)
    4. Design, fabricate & supply Pallet for Pnl Fr/Rr Dr Inr LH/RH P6-20A (Year 2008)

  • Client: Honda Malaysia Sdn Bhd

    1. Supply & install floor metal plate damage (Year 2011)
    2. Install Pump System for Drum Storage Area (Year 2011)
    3. Design, fabricate, install and commissioning of RR SUS Lifter (Year 2009)
    4. Fabricate and install New Safety Fence (Year 2008)

  • Client: Fuji Seats (Malaysia) Sdn Bhd

    1. Maintenance service for ductwork system (Year 2010)
    2. Design, fabricate & install Rotary Table for seat cushion installation (Year 2010)
    3. Pokayake System for Conveyor M & L (Year 2009)
    4. Install Ducting Systems for D46T Line (Year 2009)
    5. Supply & install AGV Trolley (Year 2009)

 